Lazaro Cardenas third multi-purpose terminal
One of 10,000+ projects Taiyo tracks in Mexico.
Source: World Bank Group
The port of Lazaro Cardenas was the largest Mexican seaport and one of the largest seaports in the Pacific Ocean basin in 2013, located in Michoacan State, with an annual traffic capacity of around 25 million tonnes of cargo and 2,200,000 TEU's (2013). It was comprised of public and private terminals. Among the public terminals there were: grain, multi-purpose and container terminals. This project
- Status
- Prospective
- Sector
- Consumer Products, Seaport, Road, Water Supply and Storage, Government
- Location
- Mexico
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Lazaro Cardenas third multi-purpose terminal
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The port of Lazaro Cardenas was the largest Mexican seaport and one of the largest seaports in the Pacific Ocean basin in 2013, located in Michoacan State, with an annual traffic capacity of around 25 million tonnes of cargo and 2,200,000 TEU's (2013). It was comprised of public and private terminals. Among the public terminals there were: grain, multi-purpose and container terminals. This project refers to the third multi-use terminal of the port, some other terminals of the port are included under different project numbers. Lazaro Cardenas Third Multipurpose Terminal (LCMT) was a multipurpose terminal located in the port of Lazaro Cardenas. It had a total area of 19.6 hectares, a 286 metre berth with depth alongside of 14 metres. Hutchison Port Holdings (HPH) won a 30-year concession to operate the third multi-use terminal at Lazaro Cardenas port in November 2012. HPH was expected to invest some US$59.5million (784 million pesos) in the terminal. In May 2013 the terminal was already operational. HPH carried out an equipment installation phase that included the installation of 30 forklifts, 10 tractors and 10 grain trucks. HPH also operated one of Lazaro Cardenas' container terminals. |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | Mexico |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Seaport, Road, Water Supply and Storage, Government |
Article published date | 2024-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
