LB - Ba'albeck Water and Wastewater Project
Sector: Water Supply and Storage • Location: Lebanon
Source: World Bank Group
The main development objectives of the Ba'albeck Water and Wastewater Project include 1) developing and strengthening the capacity of the water and irrigation authorities; 2) improving population coverage and customer access to satisfactory water supply and wastewater services; 3) involving the private sector in the operation and maintenance of the water and wastewater facilities; and 4) rationali
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Raw Materials, Government
- Location
- Lebanon
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about LB - Ba'albeck Water and Wastewater Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The main development objectives of the Ba'albeck Water and Wastewater Project include 1) developing and strengthening the capacity of the water and irrigation authorities; 2) improving population coverage and customer access to satisfactory water supply and wastewater services; 3) involving the private sector in the operation and maintenance of the water and wastewater facilities; and 4) rationalizing the use of water by introducing water meters. There are five project components. The first component establishes a technical support unit that assists in strengthening existing water authorities and in preparing for their consolidation under one regional authority with the integration of water. This includes a comprehensive training program. The second component extends water distribution mains and house connections to increase water supply coverage. The third component improves and increases service coverage for wastewater collection and treatment. It provides treated effluents and sludge suitable for agricultural reuse. The fourth component comprises service contracts covering the water and sewage networks, the water supply facilities, and the wastewater treatment plant. The fifth component includes supervision of construction works and service contracts; and some specific studies. |
Original sector | FY17 - Public Administration,FY17 - Water, Sanitation and Waste Management |
Budget |
Location
Country | Lebanon |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Raw Materials, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Lebanon
- Individual Consultant for the irrigation rehabilitation and modernization project + Add no.1
- Danniye Irrigation: supervision
- Consultancy Services to the Ministry of Energy and Water (MOEW) for the Electricity Sector Reform Program + Add no.1&2&3&4&5
- South Bekaa Irrigation Scheme - Detailed Design & Tender Documents (Phase I - 2,000 hectares)
- Cleaning of Saida and its suburbs Waste Water and Rain Water networks : Technical Assistance and Supervision
- Chouf coastal area wastewater: extension of feasibility study
- SIUC-1 Water Supply and Wastewater (World Bank financing)
- Management Support Services Contract for Consulting Services for Strengthening the Capacity of the Ministry of Energy and Water (MOEW) to implement Power Sector Policy Reforms
