logo
ProjectClosed

LB- GREATER BEIRUT WATER SUPPLY

One of 7,095 projects Taiyo tracks in Lebanon.

Source: World Bank Group

The project development objective of the Greater Beirut Water Supply Project for Lebanon is to increase the provision of potable water to the residents in the project area within the Greater Beirut region, including those in the low-income neighborhoods of Southern Beirut, and to strengthen the capacity of the Beirut Mount Lebanon Water Establishment in utility operations. There are three componen

Status
Closed
Sector
Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Tunnel, Power Generation (CCGT), Government
Location
Lebanon
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about LB- GREATER BEIRUT WATER SUPPLY

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “LB- GREATER BEIRUT WATER SUPPLY” is an infrastructure initiative in the Water Supply and Storage sector, located in Lebanon. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project development objective of the Greater Beirut Water Supply Project for Lebanon is to increase the provision of potable water to the residents in the project area within the Greater Beirut region, including those in the low-income neighborhoods of Southern Beirut, and to strengthen the capacity of the Beirut Mount Lebanon Water Establishment in utility operations. There are three components to the project. Component one: bulk water supply infrastructure. Component one will comprise: (a) the construction and construction supervision of bulk water supply infrastructure; (b) design, construction and construction supervision of a water treatment plant (WTP) of 250,000 cubic meters a day capacity; (c) all related equipment including pumps and valves; and (d) support to Council for Development and Reconstruction for project management. Component two: supply reservoirs, distribution network and metering. Component two will comprise: (i) design, construction and construction supervision of 16 supply reservoirs of storage capacities varying between 500 and 1,000 m3 each, dispersed within the project area, and associated pumping stations; (ii) design, construction and construction supervision of water supply distribution network of about 187 km of pipelines across the project area in southern Beirut and parts of the Metn, Baabda and Aley areas; (iii) installation of 200,000 household meters in selected project areas; and (iv) installation of about 30 bulk water meters at reservoirs and distribution chambers. Component three: project management, utility strengthening and national studies. Component three will focus on utility strengthening and will also strengthen the capacity of the Ministry of Energy and Water for project oversight.

Original sector

FY17 - Water, Sanitation and Waste Management

Budget

Location

Country

Lebanon

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Tunnel, Power Generation (CCGT), Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project