LB-POWER SECT. RESTRUCT
One of 7,095 projects Taiyo tracks in Lebanon.
Source: World Bank Group
The objectives of this Power Sector Restructuring and Transmission Expansion Project are to: a) expand the high voltage transmission system to meet an integrated system peak demand of approximately 1,500 MW at the N-1 level of reliability; and b) to assist the borrower in implementing the action program in the Letter of Sectoral Development Policy (LSDP) which provides for establishing an enabling
- Status
- Closed
- Sector
- Power Transmission, Power Generation (CCGT), Government
- Location
- Lebanon
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about LB-POWER SECT. RESTRUCT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objectives of this Power Sector Restructuring and Transmission Expansion Project are to: a) expand the high voltage transmission system to meet an integrated system peak demand of approximately 1,500 MW at the N-1 level of reliability; and b) to assist the borrower in implementing the action program in the Letter of Sectoral Development Policy (LSDP) which provides for establishing an enabling environment for private sector involvement in the power section, including the institutional restructuring of the sector. The project comprises two elements: a) an investment component which will include double and single circuit 220-kV transmission lines, underground 220-kV cables and new 220-kV substations; and b) an institutional development component consisting of technical assistance for project implementation, training, and assistance to implement the institutional reform action program defined in the Government's LSDP. |
Original sector | Energy and Extractives,FY17 - Public Administration |
Budget |
Location
Country | Lebanon |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Power Generation (CCGT), Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in Lebanon
- Supervision Services for the Beirut City Services Upgrading HV Cables Works from Horse Race Course (Omar Beyhom) to Basta Main Electrical Substation
- Supervision of the expension of the transmission network/ Addendum No 1
- Ksara Substation 400/220 KV
- National control centre - Tender documents
- Expansion of power transmission system - HV substations - Section 2 (Halate, Ksara & Sour) (FRF)
- Preparation of Studies, Tender Documents and Evaluation of Bids for the Expansion of Deir Nbouh and Deir Amar Substations (EDL) + Add no.1
- Construction of 220KV OHL at Deir Amar - Deir Nbouh
- Expansion of Deir Nbouh and Deir Amar Substations