LBJ Express, TX

Sector: Automotive • Location: Dallas, United States

Source: Ferrovial

Project
Close

Ferrovial Business Lines Projects LBJ Express, TX Dallas, United States Concession Website $2.2B Total investment 13.3 Miles of length 2009-2061 Concession period 2015 Opening date Construction, maintenance and management of a 27 km section of the Lyndon B. Johnson (LBJ) Expressway. The project was delivered in September 2015, after five years of construction, with zero infractions, fines or env

Project Information FAQ

Project Information

5 Q
The project “LBJ Express, TX” is an infrastructure initiative in the Automotive sector, located in Dallas, United States. Taiyo aggregates data on it from Ferrovial.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Ferrovial Business Lines Projects LBJ Express, TX Dallas, United States Concession Website $2.2B Total investment 13.3 Miles of length 2009-2061 Concession period 2015 Opening date Construction, maintenance and management of a 27 km section of the Lyndon B. Johnson (LBJ) Expressway. The project was delivered in September 2015, after five years of construction, with zero infractions, fines or environmental penalties. Ferrovial Construction | LBJ Express aerial view (2014) Since it was built 40 years ago, the LBJ highway has become one of the most congested roads in the United States. The extension project began towards the end of 2010 and was opened in September 2015, on budget and 3 months ahead of schedule, after five years of construction works with zero contingencies, fines or environmental penalties. The new LBJ Express increase the driving capacity of the old LBJ. Up to six new toll lanes have been added in the I-635 section, and four on the I-35 section. This extension aims to cover the needs arising through population growth over the next 30 years. The most important reconstruction section of the I-635 within this project is the provision of two main interchanges (the I-35E and the North Dallas Tollway), 12 major overhead passes, six overhead passes for slip roads and a walkway for pedestrians (the Joe Ratliff Walkway). Overall, works have comprised the building of a concrete structure the size of 120 football fields and a wearing surface equivalent to 280 fields, with the excavation of close to 7 million cubic meters of earth.Some 100 km of pilings have been used, 330 km of prefabricated beams and 320,000 m2 of different types of walls have been put up. The 9 lanes in each direction making up the highway have involved the construction of over 350 km of lanes, with one section of the highway having up to 28 lanes. Innovative Funding in the US This project was at the time the largest PPP (Private Public Partnership) to be developed in the U.S. before the I-66 Highway and to date in the Southwest of the U.S. Dynamic Tolls This new infrastructure allows drivers to opt for using the free lanes for shorter trips, while ensuring more reliables driving times on the toll sections. The LBJ Express is fitted with a managed lanes toll system (or express toll lanes). Drivers can view rate adjustments depending on the average speed or number of vehicles using the express lanes. Thus, outside rush hours, rates drop compared to times when traffic is heavier. This dynamic pricing system provides a traffic management tool which guarantees drivers that they can carry out their daily commutes more quickly. Drivers can thus opt to pay toll and use the managed lanes, or drive on the renovated free lanes. Description of the Technical Project Works were divided into the following sections: I-35E section (from Loop12/IH35E to Crown Rd): The first one has a length of 3.6 miles along the I35E interstate corridor, from I635 South to connect with the Loop 12 ring road. In this segment, the concessionaire built and currently operates two toll lanes in each direction, while the maintenance of toll-free lanes is the responsibility of the Texas Department of Transportation. I-635/I-35E interchange: The Second segment, whose length is 5.0 miles, is located on the I635 corridor, between I35E and the Dallas North Tollway. The configuration of this segment includes: service roads (2 lanes for each way), toll-free lanes (4-5 lanes for each way) and dynamic toll lanes (3 lanes for each way).  I-635 Section (east of I-35E to US 75 approximately): The third segment, also located on the I635 corridor, has a length of 4.6 miles and runs between the Dallas North Tollway and the east of the US75 corridor. The configuration of this segment is similar to that of Segment 2. Safety Thanks to a stringent accident prevention program covering 9,000 workers, the LBJ Express project was completed with a safety incident rate of 1.2, a figure which is well below the national average of 4.2, with no fatalities or serious injuries in the work area after over 16 million hours worked. Quality and Environment Works were carried out under an ISO 9001 quality system and an ISO 14001 environmental control system, with the LBJ being the first construction project in the state of Texas to comply with this essentially European standard. The Environmental Team of the LBJ Express was highly efficient in the application of both creativity and innovation leading to the general success of the project. The LBJ Express project has been – and continues to be –recognized as a model to be followed given the quality and environment practices used on it. The Construction Stage Construction consists of: 90 bridges including multiple three level interchanges and direct connectors with two major congested freeways.Dallas North Tollway and I-35E9.3 million cubic yards of earthwork575,000 tons of paving3.4 million square feet of retaining wallsInstallation of IT and toll collection systemsLive traffic with AADT > 200,000. IH 635 Managed Lanes Reconstruction The LBJ Express project will rebuild IH 635, one of the busiest and most congested highways in North Texas. The project features a combination of four general use lanes and two to three continuous frontage roads in each direction, along with 13 miles of three managed toll lanes in each direction that will use dynamic pricing to keep traffic moving above 50 mph. The managed lanes will feature about 5 miles of new depressed roadway. When complete, the LBJ Express will reduce travel delays, provide mobility choices, improve safety, and help reduce the carbon footprint associated with idling traffic. The goal of this project is to relieve congestion on 13 miles of IH 635 (LBJ) and IH 35E. The design-build joint venture is responsible for the design and construction of the project under a lump-sum, fixed-price contract with LBJ Mobility Partners. The contractual design-build period is 60 months. Project has been split into three sections and each of the sections has a different Segment Construction Manager, with specific supervisory staff allocated to each section.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Medium

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data