LBRID Groundwater Inflow Mitigation Phase 1
Sector: Road • Location: Pope Valley, California, United States of America
Source: Dodge USA
A. The Project is defined as the following: 1. Supply and installation of 1700 LF of subdrain including trench backfill and 5" perforated PVC pipe along the north side of the access track 3 20-ft deep, supply and construction of piping outlets as shown on the drawings. 2. Initial test trench excavations to determine depth of bedrock and confirm drain alignment and depth. 3. Installation of approxi
- Status
- Prospective
- Sector
- Road, Government, Commercial, Waste Processing and Treatment, Water Supply and Storage
- Location
- Pope Valley, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about LBRID Groundwater Inflow Mitigation Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A. The Project is defined as the following: 1. Supply and installation of 1700 LF of subdrain including trench backfill and 5" perforated PVC pipe along the north side of the access track 3 20-ft deep, supply and construction of piping outlets as shown on the drawings. 2. Initial test trench excavations to determine depth of bedrock and confirm drain alignment and depth. 3. Installation of approximately 104 feet of 12 inch HDPE Bypass piping to Pond 3. 4. Installation of a V-ditch and road re... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Pope Valley |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Government, Commercial, Waste Processing and Treatment, Water Supply and Storage |
Article published date | 2024-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- CARTER TOWN ROAD
- DUDLEY-STATE ROUTE 29 ROAD
- CR 299/CCC CAMP ROAD @ EMERY CREEK 6.5 MI SE OF CRANDALL
- SR 202 FROM THOMAS COUNTY LINE TO SR 111
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- SIX STREETS IN FAYETTEVILLE
- SR 49 @ SWEETWATER CRK & VINEY CRK 1 MI S OF ANDERSONVILLE
- CS 600/S CHURCH STREET FROM SR 30 TO W PINE STREET - TIA
