logo

LC Disaster Management Project II

Sector: Aerospace & Defense • Location: St. Lucia

Source: World Bank Group

Project
Closed

The project aims at further reducing the country's vulnerability to adverse natural events (hurricane, floods, etc.) through investment in risk management activities. The project has the following four components: Component 1) Physical Prevention and Mitigation Work: (a) coastal protection works for Dennery Village; (b) rehabilitation and reconstruction of two bridges; (c) drainage, river walls an

Status
Closed
Sector
Aerospace & Defense, Water Supply and Storage, Warehouse, Waste Processing and Treatment, Telecommunications, Commercial, Government, Residential
Location
Saint Lucia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about LC Disaster Management Project II

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “LC Disaster Management Project II” is an infrastructure initiative in the Aerospace & Defense sector, located in St. Lucia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project aims at further reducing the country's vulnerability to adverse natural events (hurricane, floods, etc.) through investment in risk management activities. The project has the following four components: Component 1) Physical Prevention and Mitigation Work: (a) coastal protection works for Dennery Village; (b) rehabilitation and reconstruction of two bridges; (c) drainage, river walls and slope stabilization. (d) retrofitting of schools; (e) retrofitting of health centers; (f) procurement of additional stock of gabion baskets, mattresses and geotextile; (g) technical audits for the coastal protection works at Dennery Village; (h) training and capacity building for the technical service division. Component 2) Strengthening Emergency Preparedness and Response: (a) construction of the Emergency Operations Center (EOC) and central warehouse; (b) additional satellite warehouses; (c) installation of water tanks in shelters; (d) technical assistance and training for the National Emergency Management Office (NEMO); (e) specialized disaster equipment. Institutional Strengthening: (a) building code training and sensitization; (b) technical assistance in territorial planning; (c) vulnerability assessment and hazard mapping; (d) study on vulnerability and risk transfer of government assets. Component 4) Project Management: (a) technical assistance to the Project Coordination Unit (PCU), with the recruitment of a project accountant, a technical engineer and support staff. Project management services, office equipment and supplies are also included. (b) technical Audits.

Original sector

FY17 - Public Administration,FY17 - Social Protection,FY17 - Transportation,FY17 - Water, Sanitation and Waste Management

Budget

Location

Country

Saint Lucia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Aerospace & Defense, Water Supply and Storage, Warehouse, Waste Processing and Treatment, Telecommunications, Commercial, Government, Residential

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project