LCAAP Energetic Waste Incinerator Complex SOURCES SOUGHT
One of 10,000+ projects Taiyo tracks in Missouri.
Source: Dodge
The scope of this Design-Bid-Build (DBB) contract is for the construction a new Energetic Waste Incinerator building that is controlled for the environment applying applicable safety regulations, efficiency, and security regulations to replace the existing Building 97 and associated storage facilities. The new energetic waste incinerator facility will provide an updated facility for disposal of en
- Status
- Closed
- Sector
- Manufacturing (Industrial), Water Supply and Storage, Waste Processing and Treatment, Commercial
- Location
- Independence, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about LCAAP Energetic Waste Incinerator Complex SOURCES SOUGHT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of this Design-Bid-Build (DBB) contract is for the construction a new Energetic Waste Incinerator building that is controlled for the environment applying applicable safety regulations, efficiency, and security regulations to replace the existing Building 97 and associated storage facilities. The new energetic waste incinerator facility will provide an updated facility for disposal of energetic materials. Construction at LCAAP site will include: Energetic waste incinerator building ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | Independence |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Water Supply and Storage, Waste Processing and Treatment, Commercial |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
