logo
ProjectClosed

L’échappée / Atelier WOA

Closed · Last reported Nov 2023

Source: ArchDaily

‘‘L’échappée’ (or the ‘escapade’) stands for a place of meetings and exchanges, and a call to culture. A contemporary forum where both younger and older generations should feel at home. “L’échappée” of Herblay-sur-Seine embodies the simple paradox of a landmark building that seeks to blend into its environment.It maintains a strong relationship with its topography. From the ground, the forecourt t

Status
Closed
Sector
Education, Metal, Residential, Commercial
Updated
22 Jul 2026
Source
ArchDaily

ConstructChat

Ask ConstructChat about L’échappée / Atelier WOA

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “L’échappée / Atelier WOA” is an infrastructure initiative in the Education sector. Taiyo aggregates data on it from ArchDaily.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

‘‘L’échappée’ (or the ‘escapade’) stands for a place of meetings and exchanges, and a call to culture. A contemporary forum where both younger and older generations should feel at home. “L’échappée” of Herblay-sur-Seine embodies the simple paradox of a landmark building that seeks to blend into its environment.It maintains a strong relationship with its topography. From the ground, the forecourt transforms into terraced steps, gradually becoming a structure. The construction changes as it rises, transitioning from a mineral base with massive stone (extracted from the quarry of Saint-Maximin located 30 km away) to a fine metal mesh, culminating in a landscaped roof. This gentle curtain cascading from the roof offers nuances depending on the glazed or opaque sections it covers.The dynamic effect of this uplift is a call—an invitation to enter, to be entertained, informed, and share. The expansive interior volume consists of a completely open plan, providing maximum flexibility and adaptability for future uses.The roof is built as a fifth facade. Completely green and free of technical elements, it integrates the building into the landscape, offering a qualitative and unobstructed view to the surrounding structures. In the manner of Haussmannian buildings, wood and stone come together and interlock to form a durable and high-quality construction principle.

Location

Not available for this record.

Source

Source

ArchDaily

URL

More Details

Record type

Project

Sector

Education, Metal, Residential, Commercial

Article published date

2025-06-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project