logo
ProjectBid Results

Lead Jointed Watermain Replacement

Bid results · Wisconsin · Last reported Apr 2024

Source: Dodge USA

The project consists of providing all labor and material for replacing ~1800 feet of 8-inch water main under residential streets. The project includes valves, hydrants, and water service and curb box replacements; 9 catch basins, 7 manholes, and ~ 900 ft of new storm sewer pipe installation; and ditch reshaping; ~ 3000 feet of curb and gutter: 7,000 square yards of asphalt pavement installation; a

Status
Closed
Sector
Water Supply and Storage, Residential, Waste Processing and Treatment, Road, Government, Commercial
Location
New Auburn, Wisconsin, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Lead Jointed Watermain Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Lead Jointed Watermain Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in New Auburn, Wisconsin, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project consists of providing all labor and material for replacing ~1800 feet of 8-inch water main under residential streets. The project includes valves, hydrants, and water service and curb box replacements; 9 catch basins, 7 manholes, and ~ 900 ft of new storm sewer pipe installation; and ditch reshaping; ~ 3000 feet of curb and gutter: 7,000 square yards of asphalt pavement installation; and associated work.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Wisconsin

City

New Auburn

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Residential, Waste Processing and Treatment, Road, Government, Commercial

Article published date

2024-04-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project