Lead Service Line Replacements - Cycle 1
One of 10,000+ projects Taiyo tracks in Pennsylvania.
Source: Dodge USA
LEAD SERVICE LINE REPLACEMENTS CYCLE 1: The Project generally comprises soft dig of curb box to verify service line type, replacement of public and private lead and/or galvanized service lines. Lead service line replacements will include the installation of copper service line, corporation stops, curb stops, curb boxes and connection to existing plumbing inside homes and businesses along with Risk
- Status
- Closed
- Sector
- Metal, Residential, Water Supply and Storage, Government, Commercial, Waste Processing and Treatment
- Location
- Allentown, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Lead Service Line Replacements - Cycle 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | LEAD SERVICE LINE REPLACEMENTS CYCLE 1: The Project generally comprises soft dig of curb box to verify service line type, replacement of public and private lead and/or galvanized service lines. Lead service line replacements will include the installation of copper service line, corporation stops, curb stops, curb boxes and connection to existing plumbing inside homes and businesses along with Risk Mitigation Management procedures. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Allentown |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Residential, Water Supply and Storage, Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
