Lead Services Replacement Phase 3 & 4
Sector: Metal • Location: Bloomfield, New Jersey, United States of America
Source: Dodge USA
The scope of Work contemplated for the abovenamed Project includes exploratory test pits over existing water curb stops to determine the existing materials and installation of new copper water services as well as all other Work of any type or description necessary for contemplation of the Projec
- Status
- Closed
- Sector
- Metal, Water Supply and Storage, Government, Commercial, Waste Processing and Treatment
- Location
- Bloomfield, New Jersey, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Lead Services Replacement Phase 3 & 4
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of Work contemplated for the abovenamed Project includes exploratory test pits over existing water curb stops to determine the existing materials and installation of new copper water services as well as all other Work of any type or description necessary for contemplation of the Projec |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Jersey |
City | Bloomfield |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Water Supply and Storage, Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-07-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- BRIDGE PRESERVATION @ 6 LOCS IN DISTRICT 4
- Shivwits Band of Paiutes Fiber Ring Connectivity Project
- PARTIAL METAL BEAM REPLACEMENT DUE TO FIRE DAMAGE, ROOF REPLACEMENT WORK DUE TO FIRE DAMAGE
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- TO CONSTRUCT 15,000 SF PRE-FAB METAL BUILDING AND ASSOCIATED SITE IMPROVEMENTS (1069 & 1089 INDUSTRIAL)
- Willard InterContinental Hotel
- Pacific Visions Wing at the Aquarium of the Pacific
