Leadwood Water Treatment and Well House Buildings Contract #
Closed · Missouri · Last reported Sep 2024
Source: Dodge USA
Construction of a new package radionuclide water treatment facility and two new CMU well houses with all necessary equipment, piping, electrical and SCADA systems, as well as all other work prescribed in the supplemental design drawings and specifications necessary to make the systems complete and useable.
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Government, Waste Processing and Treatment, Commercial
- Location
- Leadwood, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Leadwood Water Treatment and Well House Buildings Contract #
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of a new package radionuclide water treatment facility and two new CMU well houses with all necessary equipment, piping, electrical and SCADA systems, as well as all other work prescribed in the supplemental design drawings and specifications necessary to make the systems complete and useable. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | Leadwood |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Government, Waste Processing and Treatment, Commercial |
Article published date | 2024-09-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
