LEAKE MOUNDS-ETOWAH RIVERWALK LINK
Complete · Georgia
Source: Georgia Department of Transportation (GDOT)
This project consists of 10-foot wide paved multi-use trailway, with 2-foot shoulders on each side. The trail will provide three rest area with benches and trash receptacles. The project begins at S.R. 61/113 and runs in a northeast direction paralleling Pettit Creek and bridges over Pettit Creek just south of the S.R. 61/113 Pettit Creek Bridge. The trail continues south along Walnut Grove Road
- Status
- Closed
- Sector
- Metal, Bridge, Car parking, Raw Materials, Road, Government, Automotive, Steel, Manufacturing (Industrial)
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about LEAKE MOUNDS-ETOWAH RIVERWALK LINK
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of 10-foot wide paved multi-use trailway, with 2-foot shoulders on each side. The trail will provide three rest area with benches and trash receptacles. The project begins at S.R. 61/113 and runs in a northeast direction paralleling Pettit Creek and bridges over Pettit Creek just south of the S.R. 61/113 Pettit Creek Bridge. The trail continues south along Walnut Grove Road and ends tying into the existing Etowah Riverwalk at the city's Milam Farm Park off Milner Road, west of Cartersville's Middle School. As part of this project, Baker Mill Pond Bridge, the Iron Bridge spanning Pettit Creek will be restored as a pedestrian walkway. The total project length is 1.9 miles. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Metal, Bridge, Car parking, Raw Materials, Road, Government, Automotive, Steel, Manufacturing (Industrial) |
Article published date | 2024-05-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
