Leamington Control Centre Blower Upgrade Phase 2
Sector: Power Generation (CCGT) • Location: Leamington, Ontario, Canada
Source: Dodge USA
Phase 2 of the Leamington Pollution Control Centre Blower Upgrades project includes removal of two (2) existing centrifugal blowers and installation of one (1) new high speed turbo blower. The project includes all structural, process mechanical, electrical, instrumentation, controls and programming works.
- Status
- Closed
- Sector
- Power Generation (CCGT), Waste Processing and Treatment, Government, Commercial, Water Supply and Storage
- Location
- Leamington, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Leamington Control Centre Blower Upgrade Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Phase 2 of the Leamington Pollution Control Centre Blower Upgrades project includes removal of two (2) existing centrifugal blowers and installation of one (1) new high speed turbo blower. The project includes all structural, process mechanical, electrical, instrumentation, controls and programming works. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Ontario |
City | Leamington |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Waste Processing and Treatment, Government, Commercial, Water Supply and Storage |
Article published date | 2024-08-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
