Leander High School Athletic Area Modernization
Sector: Steel • Location: Leander, Texas, United States of America
Source: Dodge USA
Phase 1 of the Masterplan Redesign specifically addresses the Athletic area [campus layout] of the campus. This phase will be split into four separate sections: Phase 1A Relocating the utilities for the auxiliary gym (29,252 SF) and weight room additions (6,556 SF). Construction estimated to start Summer 2024 Phase 1B Addition of an Auxiliary Gym (to be located next to the existing Competition Gym
- Status
- Closed
- Sector
- Steel, Education, Commercial, Power Transmission, Power Generation (CCGT), Manufacturing (Industrial), Government
- Location
- Leander, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Leander High School Athletic Area Modernization
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Phase 1 of the Masterplan Redesign specifically addresses the Athletic area [campus layout] of the campus. This phase will be split into four separate sections: Phase 1A Relocating the utilities for the auxiliary gym (29,252 SF) and weight room additions (6,556 SF). Construction estimated to start Summer 2024 Phase 1B Addition of an Auxiliary Gym (to be located next to the existing Competition Gym) and a new Weight Room. This phase also includes security gates to enable the campus to be separ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Leander |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Steel, Education, Commercial, Power Transmission, Power Generation (CCGT), Manufacturing (Industrial), Government |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- BRIDGE PRESERVATION @ 6 LOCS IN DISTRICT 4
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- Pacific Visions Wing at the Aquarium of the Pacific
- WilmerHale Tenant Fit-Out
- UW Seismic Improvements
- DCA Terminal A Improvements
- Kansas City International Airport (MCI) New Single Terminal
