Leavenworth Lift Station 2 Improvements Project
Sector: Water Supply and Storage • Location: Leavenworth, Indiana, United States of America
Source: Dodge
The project includes but is not limited to upgrading the Town's existing Lift Station 2 facility. The Lift Station #2 upgrade work includes: new submersible pump, existing pump modifications, new monitoring and control package with VFDs and all lift station accessories for a complete operational pump system. The existing valve vault work includes replacement of check and plug valves. Additional wo
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Waste Processing and Treatment, Commercial, Power Transmission, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Leavenworth, Indiana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Leavenworth Lift Station 2 Improvements Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project includes but is not limited to upgrading the Town's existing Lift Station 2 facility. The Lift Station #2 upgrade work includes: new submersible pump, existing pump modifications, new monitoring and control package with VFDs and all lift station accessories for a complete operational pump system. The existing valve vault work includes replacement of check and plug valves. Additional work includes bypass pumping, electrical utility coordination, and all other work required for the ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Indiana |
City | Leavenworth |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Waste Processing and Treatment, Commercial, Power Transmission, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2025-01-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
