Lebanon Electricity Transmission Project
Sector: Water Supply and Storage • Location: Lebanon
Source: World Bank Group
The Project aims to provide priority expansion and upgrades of Lebanon’s transmission grid and of the power system control toachieve these goals. With the added lines and substations, the system will be able to respond to the increasing electricity demandand support economic growth and social services in the investment areas. The Project will also facilitate investments in newgeneration plants – e
- Status
- Failure
- Sector
- Water Supply and Storage, Power Generation (CCGT), Government
- Location
- Lebanon
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Lebanon Electricity Transmission Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | dropped |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project aims to provide priority expansion and upgrades of Lebanon’s transmission grid and of the power system control toachieve these goals. With the added lines and substations, the system will be able to respond to the increasing electricity demandand support economic growth and social services in the investment areas. The Project will also facilitate investments in newgeneration plants – expected to be financed mostly by the private sector – by enabling better access to the end-use market. Theimproved quality of service will help the sector gain credibility with customers, allowing for necessary tariff adjustments toachieve cost recovery and to trigger the virtuous circle of strengthening financial viability of the sector and improving services,while reducing dependence on government subsidies. The Project will also enable different forms of electricity trading arrangements(including competitive, open access arrangements), which are easier to introduce if transmission bottlenecks are absent andphysical access to consumers unimpeded, and if there is an adequate system for managing dispatch and monitoring system operationsto ensure system security and quality of supply. |
Original sector | FY17 - Energy and Extractives |
Budget |
Location
Country | Lebanon |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Lebanon
- Rehabilitation of Metn water supply systems- Prepare/ update detailed studies and tender documents
- Preparation of detailed engineering design for Majdlaya and El Fouar villages drinking water project
- Preparation of Tender Documents for the Construction of the Works in Eastern Zahle Area and Western Bekaa and Rachaya Areas
- Master plan study for the treatment and disposal of sludge residues from wastewater treatment plants
- Cleaning of waste water and rain water networks in Beirut Southern suberbs: Technical Assistance and supervision
- Tebbaneh storm water networks-Supervision
- Preparation of a Feasibility Study for East Zahle Region Wastewater Project
- Feasibility study of West Bekaa water supply systems - Bekaa Water Supply Rehabilitation and Modernization project
