Lebanon Renewable Energy and System Reinforcement Project
Sector: Solar • Location: Lebanon
Source: World Bank Group
The Lebanon Renewable Energy and System Reinforcement Project (the Project) will lay the foundations for sector recovery, focusing on “no regret” investments needed to increase the supply of low-cost renewable energy and strengthen EDL network and systems. It will contribute to sector technical and financial readiness for large investments, notably in the renewable energy (RE) space, that macro-fi
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Lebanon Renewable Energy and System Reinforcement Project (the Project) will lay the foundations for sector recovery, focusing on “no regret” investments needed to increase the supply of low-cost renewable energy and strengthen EDL network and systems. It will contribute to sector technical and financial readiness for large investments, notably in the renewable energy (RE) space, that macro-fiscal stabilization would unlock. The loan will finance: (1) the construction of the National Control Center (NCC), critically needed for EDL to manage its network with increasing intermittent RE capacity, (2) the enhancement of energy accounting, billing, and collection practices at EDL using Advanced Metering Infrastructure (AMI) and associated energy accounting systems, (3) the construction of a grid-connected solar PV plant under Engineering, Procurement and Construction (EPC) contracts and associated grid reinforcements, as the first phase for the development of larger scale solar parks subsequently by independent power producers (IPPs), and (4) the refurbishment of three hydropower plants on the Litani river (Markabi, Awali and Joun, totalizing 192MW), to improve operational efficiency and extend HPPs lifespan. It will also include technical assistance for project implementation, strengthened financial management and for advancing sector reform agenda. A Contingent Emergency Response Component (CERC) has been included to enhance emergency preparedness. The project will result in (i) an increase in the supply of grid connected RE to consumers, (ii) a reduction in failures on the transmission network, and (iii) streamlined billing and collection cycle. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
