logo
ProjectActive

Lebanon Renewable Energy and System Reinforcement Project

Active · Lebanon

Source: World Bank Group

The Lebanon Renewable Energy and System Reinforcement Project (the Project) will lay the foundations for sector recovery, focusing on “no regret” investments needed to increase the supply of low-cost renewable energy and strengthen EDL network and systems. It will contribute to sector technical and financial readiness for large investments, notably in the renewable energy (RE) space, that macro-fi

Status
Prospective
Sector
Solar, Power Transmission, Power Generation (CCGT), Hydro, Government
Location
Lebanon
Updated
19 Nov 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Lebanon Renewable Energy and System Reinforcement Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Lebanon Renewable Energy and System Reinforcement Project” is an infrastructure initiative in the Solar sector, located in Lebanon. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The Lebanon Renewable Energy and System Reinforcement Project (the Project) will lay the foundations for sector recovery, focusing on “no regret” investments needed to increase the supply of low-cost renewable energy and strengthen EDL network and systems. It will contribute to sector technical and financial readiness for large investments, notably in the renewable energy (RE) space, that macro-fiscal stabilization would unlock. The loan will finance: (1) the construction of the National Control Center (NCC), critically needed for EDL to manage its network with increasing intermittent RE capacity, (2) the enhancement of energy accounting, billing, and collection practices at EDL using Advanced Metering Infrastructure (AMI) and associated energy accounting systems, (3) the construction of a grid-connected solar PV plant under Engineering, Procurement and Construction (EPC) contracts and associated grid reinforcements, as the first phase for the development of larger scale solar parks subsequently by independent power producers (IPPs), and (4) the refurbishment of three hydropower plants on the Litani river (Markabi, Awali and Joun, totalizing 192MW), to improve operational efficiency and extend HPPs lifespan. It will also include technical assistance for project implementation, strengthened financial management and for advancing sector reform agenda. A Contingent Emergency Response Component (CERC) has been included to enhance emergency preparedness. The project will result in (i) an increase in the supply of grid connected RE to consumers, (ii) a reduction in failures on the transmission network, and (iii) streamlined billing and collection cycle.

Original sector

Energy and Mineral Resources

Location

Country

Lebanon

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Solar, Power Transmission, Power Generation (CCGT), Hydro, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project