logo

Lebanon-Water Supply Augmentation Project

Sector: Road • Location: Lebanon

Source: World Bank

Project
Closed

The Water Supply Augmentation Project of Lebanon has an objective to increase the volume of water available to the Greater Beirut and Mount Lebanon area. The project consists of four components. The first component will finance: (i) construction and construction supervision of the Bisri Dam and the associated access road; and (ii) construction and construction supervision of the conveyor pipelines

Project Information FAQ

Project Information

5 Q
The project “Lebanon-Water Supply Augmentation Project” is an infrastructure initiative in the Road sector, located in Lebanon. Taiyo aggregates data on it from World Bank.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Water Supply Augmentation Project of Lebanon has an objective to increase the volume of water available to the Greater Beirut and Mount Lebanon area. The project consists of four components. The first component will finance: (i) construction and construction supervision of the Bisri Dam and the associated access road; and (ii) construction and construction supervision of the conveyor pipelines to the existing Joun reservoir and the associated access road; two (2) hydropower plants, generating 0.2 megawatt (MW) and 12 MW respectively; and expansion of the Ouardaniyeh water treatment plant (WTP). Component two will finance priority activities, complementary to construction of Bisri dam, to ensure the long term sustainability of water service delivery across the Greater Beirut Mount Lebanon (GBML). Component 2 will finance: (i) technical assistance to the Ministry of Energy and Water (MOEW), Beirut Mount Lebanon Water Establishment (BMLWE) and Council for Development and Reconstruction (CDR) on the operation and maintenance of dams; (ii) technical assistance to the MOEW and BMLWE on management of Beirut Mount Lebanon (BML) water resources; (iii) technical assistance to Ministry of Energy and Water and Beirut Mount Lebanon Water Establishment in developing and implementing awareness raising campaigns on the economic benefits of switching to the public water network and eventual volumetric metering water supply; (iv) environment and social mitigation measures including the construction of sewerage networks in the upstream catchment villages, as described in the Environmental and Social Management Plan (ESMP). Component three will finance: (i) strengthening capacity of core Project Management Unit (PMU) within Council for Development and Reconstruction to oversee project implementation; (ii) continued engagement of the Dam Safety Panel (DSPE) as per Bank policy requirements and of the independent environment and social Panel of Experts; and (iii) supervision of the ESMP. Finally, component four will finance the costs of compensation of land acquisition of 570 hectares of land, as well as the cost of assistance for livelihood rehabilitation and monitoring of the Resettlement Action Plan (RAP) implementation.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data