Lechang Waste-to-energy Plant Phase I
Active · China
Source: World Bank Group
The project involves the investment, construction and operation of phase I of Lechang Waste-to-energy Plant, located in the circular economy environmental protection park of Lechang City in Shaoguan City of Guangdong Province of China. The project will be constructed in 2 phases having total designed daily waste processing capacity of 1,000 tonnes. Phase I of the project has a designed daily waste
- Status
- Prospective
- Sector
- Biomass, Wind, Car parking, Commercial, Power Generation (CCGT), Waste Processing and Treatment, Government, Automotive, Manufacturing (Industrial), Water Supply and Storage
- Location
- China
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Lechang Waste-to-energy Plant Phase I
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the investment, construction and operation of phase I of Lechang Waste-to-energy Plant, located in the circular economy environmental protection park of Lechang City in Shaoguan City of Guangdong Province of China. The project will be constructed in 2 phases having total designed daily waste processing capacity of 1,000 tonnes. Phase I of the project has a designed daily waste processing capacity of 500 tonnes (182,500 tonnes/year) and will be equipped with 1 x 500 tonnes/day grate furnace and 1 x 12 MW turbine power generator. The project is expected to generate approximately 72 million kWh of green electricity per year. The sponsor China Everbright international Ltd signed a concession agreement under BOT (Build-Operate-Transfer) model for 30 years, including the construction. The project cost is approximately CNY 349 million or $ 48.76 million. Financial close was reached on 2 September 2019. https://www.ebchinaintl.com/en/media/news_content-p190902.html |
Original sector | Municipal Solid Waste |
Procurement method | |
Budget |
Location
Country | China |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Biomass, Wind, Car parking, Commercial, Power Generation (CCGT), Waste Processing and Treatment, Government, Automotive, Manufacturing (Industrial), Water Supply and Storage |
Article published date | 2024-05-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Biomass projects in China
- Baoying Waste-to-Energy plant
- Jiangsu Zhangjiagang Solid Waste Integrated Treatment Plant
- Shandong Yucheng Waste-to-energy Plant Phase I
- Shandong Weishan Waste-to-Energy plant
- Jinzhai Kaidi Biomass Power Plant
- Rudong Biomass Pellet Facilities
- Lingbi Biomass plant
- Sanitary Landfill in Sanshui District of Foshan City
