Leduc Elks Drawdown Well
Sector: Waste Processing and Treatment • Location: Alberta, Canada
Source: Infrastructure Canada
The Leduc Elks Drawdown Well Project (the Project) will install two drawdown wells to remove leachate contaminated groundwater associated with a reclaimed landfill at Elks Park to prevent contaminated groundwater entering a residential area. These wells will support the long-term remediation plan to meet the Alberta Code of Practice for Landfill Performance Standards and result in improved disaste
- Status
- Closed
- Sector
- Waste Processing and Treatment, Residential
- Location
- Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Leduc Elks Drawdown Well
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Leduc Elks Drawdown Well Project (the Project) will install two drawdown wells to remove leachate contaminated groundwater associated with a reclaimed landfill at Elks Park to prevent contaminated groundwater entering a residential area. These wells will support the long-term remediation plan to meet the Alberta Code of Practice for Landfill Performance Standards and result in improved disaster mitigation and adaptation infrastructure. The Project scope includes preparation of tender documents; tendering and reviews; a construction survey; project management by the consultant; and construction by the contractor. |
Original sector | Waste Management |
Location
Country | Canada |
State | Alberta |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Residential |
Article published date | 2026-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Canada
- Highway Rehab -- Bridge replacement Holland Drainage Canal, Bradford-West Gwillimbury
- Highway Rehab -- Resurfacing, Culvert rehabilitation, Drainage improvements Haldimand Rd. 56 to Dunnville west limits, and east limit of Dunnville to West/Central Boundary Haldimand County
- Highway Rehab -- Culvert rehabilitation Morris Drain Culvert, Lambton County
- Kirby In-Situ Oilsands Steam Assisted Gravity Drainage Buildings
- Southeast Personal Care Home
- Stonewall Woodlands Regional Water Supply
- Wastewater Lagoon Upgrades
- Russell Lagoon Upgrade
