Lee Community Center Renovation
Sector: Government • Location: Arlington, Virginia, United States of America
Source: Dodge USA
FY 2025 funding is to study options for the community center, which is partially utilized for a single art program that will be relocated in CY 2025 The study will provide conceptual cost estimates for work needed to reopen the existing building or portions, to public use standards within the existing footprint, and options for expanding the building's size. The current building does not meet acce
- Status
- Prospective
- Sector
- Government, Power Transmission, Power Generation (CCGT), Commercial, Manufacturing (Industrial)
- Location
- Arlington, Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Lee Community Center Renovation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | FY 2025 funding is to study options for the community center, which is partially utilized for a single art program that will be relocated in CY 2025 The study will provide conceptual cost estimates for work needed to reopen the existing building or portions, to public use standards within the existing footprint, and options for expanding the building's size. The current building does not meet accessibility standards and contains asbestos, non-compliant restrooms and elevator, aging windows, a... |
Budget |
Location
Country | United States of America (USA) |
State | Virginia |
City | Arlington |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Government, Power Transmission, Power Generation (CCGT), Commercial, Manufacturing (Industrial) |
Article published date | 2024-10-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Government projects in United States of America
- CARTER TOWN ROAD
- DUDLEY-STATE ROUTE 29 ROAD
- CR 299/CCC CAMP ROAD @ EMERY CREEK 6.5 MI SE OF CRANDALL
- SR 202 FROM THOMAS COUNTY LINE TO SR 111
- CR 210/GLYEN HICKMAN RD FROM SR 117 TO CR 356/AIRPORT RD-TIA
- COLUMBUS VIADUCT RAILROAD BRIDGES.
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SIGNAL COMMUNICATIONS; SERVICE & SUPPORT - FY 2018
