Lee Hall WTP Facility Improvements
Sector: Water Supply and Storage • Location: Newport News, Virginia, United States of America
Source: Dodge USA
Funds will support the rehabilitation and/or improvement of existing plants and equipment projects for the water treatment plants. Projects will include the Lee Hall finished pump diesel engine replacement and emissions upgrade, Lee Hall new facility IT equipment, Lee Hall residuals gravity thickener number 1 and 2 rehabilitation, Lee Hall Water Treatment Plant dissolved air flotation membrane roo
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Commercial, Waste Processing and Treatment
- Location
- Newport News, Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Lee Hall WTP Facility Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Funds will support the rehabilitation and/or improvement of existing plants and equipment projects for the water treatment plants. Projects will include the Lee Hall finished pump diesel engine replacement and emissions upgrade, Lee Hall new facility IT equipment, Lee Hall residuals gravity thickener number 1 and 2 rehabilitation, Lee Hall Water Treatment Plant dissolved air flotation membrane roof replacement, and the Lee Hall Water Treatment Plant yard drain abandonment. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Virginia |
City | Newport News |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
