The extent of the route for Stage 7 of the Leeds Inner Ring Road. The Stage 7 plan as set down by Leeds County Council. Work progressing on the deck of one of the bridges. Steel beams being lifted into place. The viaduct support columns. One of the three rail bridges with the concrete embankment. The UK’s Leeds Inner Ring Road Stage 7 project (LIRR7) provides the final link to connect Stage 6 of t

Project Information FAQ

Project Information

5 Q
The project "Leeds Inner Ring Road Stage 7" is an infrastructure initiative in the Advanced Electronics, Bridge, Cement, Manufacturing (Industrial), Mass Transit, Steel, Water Supply and Storage, Rail, Road, Waste Processing and Treatment, Government, Metal sector, located in N/A, Thailand. Taiyo aggregates data from Road Traffic Technology, including information on sponsoring government bodies, EPCs, and contractors.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The extent of the route for Stage 7 of the Leeds Inner Ring Road. The Stage 7 plan as set down by Leeds County Council. Work progressing on the deck of one of the bridges. Steel beams being lifted into place. The viaduct support columns. One of the three rail bridges with the concrete embankment. The UK’s Leeds Inner Ring Road Stage 7 project (LIRR7) provides the final link to connect Stage 6 of the scheme (completed in 2000) to the M621 and the wider national motorway network. Construction of this £50m scheme began in May 2006 and was completed in late 2008. The design and construction of the project was initiated by Leeds City Council via a two-phase process involving an early contractor involvement (ECI) contract that was awarded to Alfred McAlpine in March 2005. Phase I, which commenced in April 2005, involved detailed design by a joint Leeds City Council / Mouchel Parkmanteam brought together as part of a wider partnership agreement. Phase II, the construction works, began in May 2006.Leeds City Council, in partnership withMouchel Parkman, was the supervisor for the construction phase. Route of Leeds Inner Ring Road The Leeds Inner Ring Road is part motorway and part A road. Most of it is designated the A58(M) – a motorway section of the A58 road – while a short section is the A64(M), part of the A64 road. The motorway section is 2.5m (3.8km) long and is subject to a 40mph speed limit throughout. The remainder of the route is the A61. The route for Stage 7 runs from South Accommodation Road in Hunslet and connects with Junction 4 of the M621. It comprises the construction of dual two and three-lane carriageways, through a previously industrial area, with slip road links to the M621. The principal features of the scheme are a 600m long viaduct over the existing local road network, and three bridges over the Leeds-to-Castleford railway line. Stage 7 achievements The Leeds Inner Ring Road Stage 7 scheme assists in the removal of remaining through traffic from the Leeds central area, and in conjunction with the M621 providing a continuous circulatory route around the city centre. The scheme has improved travel times across the city and relieved congestion in the Hunslet and Holbeck areas as well as the city centre. The scheme has also improved access to the Aire Valley Leeds regeneration area, following the completion of the East Leeds Link Road in 2008. It also allows the full benefits derived from city centre traffic innovations of the past 15 years, including the city centre loop, Public Transport Box and improvements to pedestrian areas and public space refurbishment. The main contractor on this scheme was Pierse Contracting. Project details of Leeds Inner Ring Road Stage 7 The positioning of steel beams on the new Hunslet Viaduct remained on schedule (January 2007) and can be seen from South Accommodation Road and Hunslet Road. These beams are 120ft long and 6ft deep, and were lifted into position by large cranes. The beams were made in weathering steel, which does not need to be painted and the colour of the beams will soften over time. The use of weathering steel enabled Leeds City Council to make considerable savings on maintenance costs over the life of the viaduct by not having to repaint the structure. All of the foundations for the viaduct piers were built and the two approach ramps were raised above ground level. Two large sewer diversions, together with three major gas main diversions, have been completed along the route in order to avoid the foundations of the bridge structures along the A61 on South Accommodation Road, Hunslet Distributor and Moor Road. Stage 7 included a new footbridge over the M621 and the Inner Ring Road. This bridge lies between Church Street-Hillidge Road and Burton Row. Technical issues The Leeds Inner Ring Road Stage 7 project is technically complex and involved substantial engineering works. One 500m section was carried out above ground level on a major new viaduct, spanning Hunslet Road from the West of the River and on to the Hunslet Distributor Road. The 600m Hunslet Viaduct features reinforced concrete underground columns, on which the concrete bases and impressive ‘wine glass’ supporting columns to the viaduct bridge deck were constructed.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date