LEFT BANK OUTFALL DR
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The eight-year project will be the first stage of a major drainage program in Sind Province to reverse the deterioration of the land resource base caused by waterlogging and salinity. Integrated irrigation, drainage, and water management measures will permit increased cropping intensities and a reduction in abandoned land in an area of more than 0.5 million ha. Principal project components includ
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Raw Materials, Government
- Location
- Pakistan
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about LEFT BANK OUTFALL DR
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The eight-year project will be the first stage of a major drainage program in Sind Province to reverse the deterioration of the land resource base caused by waterlogging and salinity. Integrated irrigation, drainage, and water management measures will permit increased cropping intensities and a reduction in abandoned land in an area of more than 0.5 million ha. Principal project components include: (a) completion of a 300 km outfall drain and remodelling of existing drains to dispose of saline effluent to the Arabian Sea; (b) installation of a surface and subsurface drainage network in the three subareas; and (c) installation of a power distribution system to supply the drainage tubewells and drain pumps. The project further provides for: (d) introduction of on-farm water management practices including renovation of about 920 watercourses and precision land levelling; (e) remodelling of the Nara and Jamrao Canals, as well as construction of the Chotiari Reservoir, to provide supplemental irrigation water for the project area. Finally, the project includes; (f) technical assistance for project design and implementation. |
Original sector | Agriculture, Fishing and Forestry,Energy and Extractives |
Location
Country | Pakistan |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Raw Materials, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
