logo

LEFT BANK OUTFALL DR

Sector: Water Supply and Storage • Location: Pakistan

Source: World Bank Group

Project
Closed

The eight-year project will be the first stage of a major drainage program in Sind Province to reverse the deterioration of the land resource base caused by waterlogging and salinity. Integrated irrigation, drainage, and water management measures will permit increased cropping intensities and a reduction in abandoned land in an area of more than 0.5 million ha. Principal project components includ

Project Information FAQ

Project Information

5 Q
The project “LEFT BANK OUTFALL DR” is an infrastructure initiative in the Water Supply and Storage sector, located in Pakistan. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The eight-year project will be the first stage of a major drainage program in Sind Province to reverse the deterioration of the land resource base caused by waterlogging and salinity. Integrated irrigation, drainage, and water management measures will permit increased cropping intensities and a reduction in abandoned land in an area of more than 0.5 million ha. Principal project components include: (a) completion of a 300 km outfall drain and remodelling of existing drains to dispose of saline effluent to the Arabian Sea; (b) installation of a surface and subsurface drainage network in the three subareas; and (c) installation of a power distribution system to supply the drainage tubewells and drain pumps. The project further provides for: (d) introduction of on-farm water management practices including renovation of about 920 watercourses and precision land levelling; (e) remodelling of the Nara and Jamrao Canals, as well as construction of the Chotiari Reservoir, to provide supplemental irrigation water for the project area. Finally, the project includes; (f) technical assistance for project design and implementation.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data