LEFT BANK OUTFALL DR
Sector: Water Supply and Storage • Location: Pakistan
Source: World Bank Group
The eight-year project will be the first stage of a major drainage program in Sind Province to reverse the deterioration of the land resource base caused by waterlogging and salinity. Integrated irrigation, drainage, and water management measures will permit increased cropping intensities and a reduction in abandoned land in an area of more than 0.5 million ha. Principal project components includ
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The eight-year project will be the first stage of a major drainage program in Sind Province to reverse the deterioration of the land resource base caused by waterlogging and salinity. Integrated irrigation, drainage, and water management measures will permit increased cropping intensities and a reduction in abandoned land in an area of more than 0.5 million ha. Principal project components include: (a) completion of a 300 km outfall drain and remodelling of existing drains to dispose of saline effluent to the Arabian Sea; (b) installation of a surface and subsurface drainage network in the three subareas; and (c) installation of a power distribution system to supply the drainage tubewells and drain pumps. The project further provides for: (d) introduction of on-farm water management practices including renovation of about 920 watercourses and precision land levelling; (e) remodelling of the Nara and Jamrao Canals, as well as construction of the Chotiari Reservoir, to provide supplemental irrigation water for the project area. Finally, the project includes; (f) technical assistance for project design and implementation. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
