Legadadi Dam
The status, timeline and source of this project. A free account opens every field.
Source: Addis Insight
Legadadi Dam was constructed between 1967 and 1971 on the Legadadi/Sendafà river system to secure urban water supply for Addis Ababa, providing up to approximately 70% of the city's water at inauguration. The project includes a hollow gravity concrete main dam (44 m) plus a rockfill saddle dam, a treatment plant, and about 24–30 km of steel aqueducts. Long-term issues include sedimentation and wat
- Status
- Closed
- Sector
- Water Supply and Storage, Raw Materials, Hydro, Steel, Cement, Metal
- Location
- Addis Ababa, Ethiopia
- Updated
- 22 Jul 2026
- Source
- Addis Insight
ConstructChat
Ask ConstructChat about Legadadi Dam
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Legadadi Dam was constructed between 1967 and 1971 on the Legadadi/Sendafà river system to secure urban water supply for Addis Ababa, providing up to approximately 70% of the city's water at inauguration. The project includes a hollow gravity concrete main dam (44 m) plus a rockfill saddle dam, a treatment plant, and about 24–30 km of steel aqueducts. Long-term issues include sedimentation and water quality degradation due to catchment agriculture. |
Original sector | Water Supply |
Location
Country | Ethiopia |
City | Addis Ababa |
Source
Source | Addis Insight |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Raw Materials, Hydro, Steel, Cement, Metal |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Ethiopia
- Gilgel Gibe III Hydroelectric Power Project
- An expansion on producing Bottled water
- Expansion of production facility for Ethiopian spices
- Coffee processing plant
- Expansion project for bottling natural mineral water
- EIC- Children's Clothes
- Production of Envelopes and Paper Bags
- A new project on Iodized Salt production
