logo
ProjectCompleted

Legislative Complex - Electrical Upgrades

Completed · New Brunswick

Source: Infrastructure Canada

Upgrading the aging electrical service equipment for the Legislative Assembly Complex, as the equipment has passed its useful life. All of the high voltage equipment that is located in the building basement will be relocated to the exterior of the building on a new pad mount transformer, which will feed the facility. Having high voltage in the basement is dangerous, as the building is located in t

Status
Closed
Sector
Government, Power Transmission, Power Generation (CCGT), Commercial
Location
New Brunswick, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Legislative Complex - Electrical Upgrades

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Legislative Complex - Electrical Upgrades” is an infrastructure initiative in the Government sector, located in New Brunswick, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Upgrading the aging electrical service equipment for the Legislative Assembly Complex, as the equipment has passed its useful life. All of the high voltage equipment that is located in the building basement will be relocated to the exterior of the building on a new pad mount transformer, which will feed the facility. Having high voltage in the basement is dangerous, as the building is located in the flood zone. The project will also add a back-up generator, which will provide back-up power to the entire building, including fire pumps, sump pumps for flood control, etc. The new generator will be hardwire to a dedicated transfer switch for the Leg, which is a government-owned building.

Original sector

Community, Culture and Recreation

Location

Country

Canada

State

New Brunswick

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Government, Power Transmission, Power Generation (CCGT), Commercial

Article published date

2025-10-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project