logo
ProjectRepaying

Lekela Wind BOO

Sector: Water Supply and Storage • Location: Egypt

Source: European Bank for Reconstruction and Development (EBRD)

Provision of a loan for the construction, commissioning and operation of a 252 MW windfarm operating 96 wind turbines and located in the Gulf of Suez, approximately 30km North-West of Ras Ghareb in Egypt. A Project Summary document is available for this project. Non-Technical Summary (NTS): English | Arabic Updated Non-Technical Summary (NTS): English | Arabic Draft Environmental and Social Action

Status
Under Construction
Sector
Water Supply and Storage, Geothermal, Wind, Power Generation (CCGT), Residential, Commercial, Government
Location
Egypt
Updated
22 Jul 2026
Source
European Bank for Reconstruction and Development (EBRD)

ConstructChat

Ask ConstructChat about Lekela Wind BOO

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Lekela Wind BOO” is an infrastructure initiative in the Water Supply and Storage sector, located in Egypt. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Participants

Sponsoring Agency

Status

Original status

repaying

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Provision of a loan for the construction, commissioning and operation of a 252 MW windfarm operating 96 wind turbines and located in the Gulf of Suez, approximately 30km North-West of Ras Ghareb in Egypt. A Project Summary document is available for this project. Non-Technical Summary (NTS): English | Arabic Updated Non-Technical Summary (NTS): English | Arabic Draft Environmental and Social Action Plan (ESAP): English | Arabic Final Environmental and Social Action Plan (ESAP): English | Arabic The Strategic Environmental and Social Assessment (SESA) conducted by Lahmeyer/Ecoda on behalf of RCREEE is available. The final proposal for a 5-year bird monitoring program for an area of 797 km2 in the Gulf of Suez is also available. Updated documentation to reflect a change in wind turbine design and layout: Full ESIA documentation is available locally at: Environmental or social enquiries General enquiries

Original sector

Energy

Budget

Location

Country

Egypt

Source

Source

European Bank for Reconstruction and Development (EBRD)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Geothermal, Wind, Power Generation (CCGT), Residential, Commercial, Government

Article published date

2025-07-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project