logo

Lekela Wind BOO

Sector: Water Supply and Storage • Location: Egypt

Source: European Bank for Reconstruction and Development (EBRD)

Project
Repaying

Provision of a loan for the construction, commissioning and operation of a 252 MW windfarm operating 96 wind turbines and located in the Gulf of Suez, approximately 30km North-West of Ras Ghareb in Egypt. A Project Summary document is available for this project. Non-Technical Summary (NTS): English | Arabic Updated Non-Technical Summary (NTS): English | Arabic Draft Environmental and Social Action

Project Information FAQ

Project Information

5 Q
The project “Lekela Wind BOO” is an infrastructure initiative in the Water Supply and Storage sector, located in Egypt. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

repaying

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Provision of a loan for the construction, commissioning and operation of a 252 MW windfarm operating 96 wind turbines and located in the Gulf of Suez, approximately 30km North-West of Ras Ghareb in Egypt. A Project Summary document is available for this project. Non-Technical Summary (NTS): English | Arabic Updated Non-Technical Summary (NTS): English | Arabic Draft Environmental and Social Action Plan (ESAP): English | Arabic Final Environmental and Social Action Plan (ESAP): English | Arabic The Strategic Environmental and Social Assessment (SESA) conducted by Lahmeyer/Ecoda on behalf of RCREEE is available. The final proposal for a 5-year bird monitoring program for an area of 797 km2 in the Gulf of Suez is also available. Updated documentation to reflect a change in wind turbine design and layout: Full ESIA documentation is available locally at: Environmental or social enquiries General enquiries

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data