Leland Reservoir Replacement Project

Sector: Cement • Location: Lafayette, California, United States of America

Source: East Bay Municipal Utility District

Project
Planned

The East Bay Municipal Utility District is replacing an 18-million-gallon reservoir/tank, located on a 14.5 acre EBMUD site opposite 1050 Leland Drive in Lafayette. Known as the Leland Reservoir and constructed 1955, it serves the surrounding area and is approaching the end of its service life. The reservoir will be demolished and replaced with two smaller and more seismically resilient concrete t

Project Information FAQ

Project Information

4 Q
The project “Leland Reservoir Replacement Project” is an infrastructure initiative in the Cement sector, located in Lafayette, California, United States of America. Taiyo aggregates data on it from East Bay Municipal Utility District.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

planned

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The East Bay Municipal Utility District is replacing an 18-million-gallon reservoir/tank, located on a 14.5 acre EBMUD site opposite 1050 Leland Drive in Lafayette. Known as the Leland Reservoir and constructed 1955, it serves the surrounding area and is approaching the end of its service life. The reservoir will be demolished and replaced with two smaller and more seismically resilient concrete tanks within the existing reservoir basin. The existing access road would be rebuilt and realigned. In addition to replacing the Reservoir, a 36-inch-diameter water pipeline will need to be set in the streets around the project site. Approximately 2,700 feet of 36-inch-diameter pipeline would be installed in Windsor Drive, Condit Road, and Leland Drive, and approximately 950 feet of 36-inch-diameter pipe would be installed on the Leland Reservoir site. The project is part of our on-going efforts to update and replace aging facilities, to maintain high water quality, and to insure reliability. Construction is expected to occur over a three-year period, from 2026-2029. On January 25, EBMUD released the Draft Environmental Impact Report (DEIR) that assesses the impacts of the project and identifies ways to reduce and/or eliminate the construction impacts. The 45-day public review period was from January 25 – March 12, 2018. Written responses to all significant environmental issues raised will be prepared and made available for review at least 10 days prior to the public hearing before the EBMUD Board of Directors, at which certification of the Final EIR will be considered. Comments received and the responses to comments will be included as part of the record for consideration by the Board of Directors. Public meetings were held in August and September 2016 as well as February 2018 following publication of the Draft EIR. Workplan and schedule: The overall environmental review process schedule is as follows: • Community Meeting #1 - August 3, 2016 • Notice of Preparation of an Environmental Impact Report (EIR) Publication - August 31, 2016 • Community Meeting #2 - September 15, 2016 • Draft EIR Publication - January 25, 2018 • Public Meetings to Review Draft EIR - February 8, 2018 • Final EIR Publication - November 29, 2018 • EBMUD Board Certification of Final EIR and Project Approval - December 11, 2018 Contact Info: Emergencies or after hours, call EBMUD at 866-403-2683 Contractors: For bid opportunities on EBMUD projects, see Business Center.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data