logo

Lem Kær Power Plant

Sector: Power Generation (CCGT)

Source: Vestas

Project
Completed

The Lem Kær hybrid power plant, installed in 2012, combines a full-size grid-connected battery energy storage system with an existing 12 MW wind power plant, marking a significant advancement in energy storage integration.

Project Information FAQ

Project Information

4 Q
The project “Lem Kær Power Plant” is an infrastructure initiative in the Power Generation (CCGT) sector. Taiyo aggregates data on it from Vestas.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Lem Kær hybrid power plant, installed in 2012, combines a full-size grid-connected battery energy storage system with an existing 12 MW wind power plant, marking a significant advancement in energy storage integration.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data