logo

Lem Kær Power Plant

Sector: Energy Storage

Source: Vestas

Project
Completed

The Lem Kær hybrid power plant, installed in 2012, combines a full-size grid-connected battery energy storage system with an existing 12 MW wind power plant. It is the first large-scale wind power plant combined with electrical storage connected to the grid.

Status
Closed
Sector
Energy Storage, Wind, Power Generation (CCGT), Warehouse
Updated
22 Jul 2026
Source
Vestas

ConstructChat

Ask ConstructChat about Lem Kær Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Lem Kær Power Plant” is an infrastructure initiative in the Energy Storage sector. Taiyo aggregates data on it from Vestas.

Participants

Company

Status

Original status

Completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Lem Kær hybrid power plant, installed in 2012, combines a full-size grid-connected battery energy storage system with an existing 12 MW wind power plant. It is the first large-scale wind power plant combined with electrical storage connected to the grid.

Original sector

Energy

Location

Not available for this record.

Source

Source

Vestas

URL

More Details

Record type

Project

Sector

Energy Storage, Wind, Power Generation (CCGT), Warehouse

Article published date

2025-03-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project