logo

Lem Turner (SR 115) over Trout River Bridge Replacement

Sector: Bridge • Location: Jacksonville, Florida, United States of America

Source: Florida Department of Transportation (FDOT)

Project
Upcoming

A Project Development & Environment (PD&E) Study is underway to evaluate alternatives for the replacement of the Lem Turner Road Bridge over the Trout River. The purpose of this project is to address structural issues related to the existing Lem Turner Road bridge over the Trout River and to make improvements to provide safe pedestrian and bicycle access along the corridor. A Project Development &

Project Information FAQ

Project Information

4 Q
The project “Lem Turner (SR 115) over Trout River Bridge Replacement” is an infrastructure initiative in the Bridge sector, located in Jacksonville, Florida, United States of America. Taiyo aggregates data on it from Florida Department of Transportation (FDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

upcoming

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

A Project Development & Environment (PD&E) Study is underway to evaluate alternatives for the replacement of the Lem Turner Road Bridge over the Trout River. The purpose of this project is to address structural issues related to the existing Lem Turner Road bridge over the Trout River and to make improvements to provide safe pedestrian and bicycle access along the corridor. A Project Development & Environment (PD&E) study is the formal process that develops and compares alternatives to determine a preferred action that meets project needs, while minimizing impacts to the social, natural, and physical environments.During the PD&E study, a number of activities are involved, including Data Collection, Purpose and Need Identification, Alternatives Analysis, Environmental Considerations, Public Involvement and Alternative Selection. A No-Build or Do Nothing Alternative, which would leave the Lem Turner Blvd. bridge over the Trout River bridge in its present condition, remains a viable alternative throughout the study. Engaging the public by sharing and receiving information is a key component of this process. The FDOT investigated a range of alternatives during the initial concept development phase of the project. This included evaluating the effects of a No-Build or Do-Nothing Alternative, which would leave the existing bridge over the Trout River in its present condition. Below is the project evaluation matrix that provides a summary comparison of the No-Build to the Build Alternative. A No-Build, or do nothing alternative, which would leave the Lem Turner Road Bridge over the Trout River in its present condition, remains a viable alternative throughout the study. The No-Build Alternative would not implement the replacement of the bridge nor any roadway improvements that are proposed for the build alternative.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data