Lemanaghan Wind Farm
Sector: Energy • Location: Offaly, Ireland
The Lemanaghan Wind Farm project involves the construction of 17 giant wind turbines, each with a height of 220 metres, on the Lemanaghan Bog in Offaly, Ireland. The project aims to generate around 80 to 100 MW of renewable power. The project has faced opposition from local groups concerned about environmental damage, visual intrusion, and impact on local residents.
- Status
- Prospective
- Sector
- Energy
- Location
- Offaly, Ireland
- Updated
- 19 Nov 2026
- Source
- Ireland Live
ConstructChat
Ask ConstructChat about Lemanaghan Wind Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The Lemanaghan Wind Farm project involves the construction of 17 giant wind turbines, each with a height of 220 metres, on the Lemanaghan Bog in Offaly, Ireland. The project aims to generate around 80 to 100 MW of renewable power. The project has faced opposition from local groups concerned about environmental damage, visual intrusion, and impact on local residents. |
Original sector | Energy |
Location
Country | Ireland |
State | Offaly |
Source
Source | Ireland Live |
URL |
More Details
Record type | Project |
Article published date | 2025-05-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
