Lenoir Fire Department Infrastructure Repair
Closed · North Carolina · Last reported Oct 2024
Source: Dodge USA
The Project includes the following Work: The project will replace and re-align approximately 420 linear feet of 42-inch corrugated metal pipe (CMP) with 42 Reinforced concrete pipe (RCP) along with 6 drainage structures. Over the last several years, a sinkhole has appeared in the greenspace between the fire department and Ridge Street NW above the 42-inch CMP pipe system. The CMP storm drainage sy
- Status
- Closed
- Sector
- Metal, Cement, Road, Government, Water Supply and Storage, Waste Processing and Treatment, Commercial
- Location
- Lenoir, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Lenoir Fire Department Infrastructure Repair
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project includes the following Work: The project will replace and re-align approximately 420 linear feet of 42-inch corrugated metal pipe (CMP) with 42 Reinforced concrete pipe (RCP) along with 6 drainage structures. Over the last several years, a sinkhole has appeared in the greenspace between the fire department and Ridge Street NW above the 42-inch CMP pipe system. The CMP storm drainage system from West Avenue NW to Ridge Street NW is in a state of failure. This project will abandon a... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Lenoir |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Cement, Road, Government, Water Supply and Storage, Waste Processing and Treatment, Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
