Les Schwab Tire Center Mitchell SD
Sector: Automotive • Location: Mitchell, South Dakota, United States of America
Source: Dodge USA
New ground-up new construction of a tire service center. The building includes, but not limited to: Earthwork, site utilities, concrete and asphalt paving, landscape & irrigation, concrete foundations and slab, CMU wall construction, steel joist & deck, membrane roofing & metal canopy roof, doors & hardware, overhead doors, storefront windows, metal stud framing & drywall, acoustical ceilings, cer
- Status
- Closed
- Sector
- Automotive, Metal, Water Supply and Storage, Cement, Commercial, Power Transmission, Road, Steel, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Mitchell, South Dakota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Les Schwab Tire Center Mitchell SD
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | sub bidding, construction documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | New ground-up new construction of a tire service center. The building includes, but not limited to: Earthwork, site utilities, concrete and asphalt paving, landscape & irrigation, concrete foundations and slab, CMU wall construction, steel joist & deck, membrane roofing & metal canopy roof, doors & hardware, overhead doors, storefront windows, metal stud framing & drywall, acoustical ceilings, ceramic tile, painting, building accessories, fire sprinkler, and MEP services |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Dakota |
City | Mitchell |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Automotive, Metal, Water Supply and Storage, Cement, Commercial, Power Transmission, Road, Steel, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- MARTA INTELLIGENT TRANSPORTATION SYSTEM (FLEET AVLS)/DEKALB
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
