logo

Lesedi Gas-to-Power Project

Sector: Solar • Location: Central District, Botswana

Source: Construction Review

Project
Under Construction

The Lesedi Gas to Power Project in Botswana is a flagship initiative by Tlou Energy Limited aimed at generating cleaner energy from the country’s coal bed methane (CBM) reserves. It involves the development of an initial 10MW gas-fired power plant, with plans to expand capacity to 25MW. The project also includes a modular data centre, the Kala Data Centre, which will be powered by gas and solar en

Status
Under Construction
Sector
Solar, Natural Gas, Geothermal, Data Center, Power Generation (CCGT)
Location
Central District, Botswana
Updated
22 Jul 2026
Source
Construction Review

ConstructChat

Ask ConstructChat about Lesedi Gas-to-Power Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Lesedi Gas-to-Power Project” is an infrastructure initiative in the Solar sector, located in Central District, Botswana. Taiyo aggregates data on it from Construction Review.

Participants

Company

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Lesedi Gas to Power Project in Botswana is a flagship initiative by Tlou Energy Limited aimed at generating cleaner energy from the country’s coal bed methane (CBM) reserves. It involves the development of an initial 10MW gas-fired power plant, with plans to expand capacity to 25MW. The project also includes a modular data centre, the Kala Data Centre, which will be powered by gas and solar energy. Infrastructure progress includes a 90% complete Lesedi substation and grid connection expected by the end of 2025. The project is being developed in phases, with phase one producing approximately 2MW and phase two expanding to 10MW, with further expansion planned beyond 10MW.

Original sector

Energy

Budget

Location

Country

Botswana

State

Central District

Source

Source

Construction Review

URL

More Details

Record type

Project

Sector

Solar, Natural Gas, Geothermal, Data Center, Power Generation (CCGT)

Article published date

2025-11-02

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project