ProjectFeasibility Study
Lesedi Power Project
Feasibility study · Botswana
Source: International Energy Agency (IEA) Hydrogen Projects Database
- Status
- Prospective
- Sector
- Power Generation (CCGT), Hydrogen, Natural Gas
- Location
- Botswana
- Updated
- 19 Nov 2026
- Source
- International Energy Agency (IEA) Hydrogen Projects Database
ConstructChat
Ask ConstructChat about Lesedi Power Project
Pick a question to edit it, or write your own.
First answer free · no account
I am a
Project Information FAQ
Project Information
3 Q
Participants
| Not available for this record. |
Status
Original status | feasibility study |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Original sector | Energy |
Location
Country | Botswana |
Source
Source reliability | Medium |
Source | International Energy Agency (IEA) Hydrogen Projects Database |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Hydrogen, Natural Gas |
Article published date | 2023-03-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in Botswana
- KSE Orapa and Mmashoro IPP
- BPC V
- BOTSWANA POWER CORPORATION IV (BPC IV)
- ZiZaBoNa Transmission Interconnector (Namibia Section)
- Botswana - Morpupe Power Station
- Botswana - The Morupule B Power Project
- Botswana - Public Enterprise Evaluation and Privatization Agency (PEEPA)
- Botswana - Renewable Energy Support Project
