logo

Lesotho - Urban Distribution Rehabilitation and Transmission Expansion Project

Sector: Power Generation (CCGT) • Location: Lesotho

Source: African Development Bank (AfDB)

Project

The Urban Distribution Rehabilitation and Transmission Expansion Project is part of the medium-term energy sector investment program approved by the Government of Lesotho for the period 2016-2020. It aims to improve the reliability and quality of electricity supply to customers. The proposed intervention focuses on expanding access, rehabilitation and improvement of the electricity supply system.

Project Information FAQ

Project Information

4 Q
The project “Lesotho - Urban Distribution Rehabilitation and Transmission Expansion Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Lesotho. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Urban Distribution Rehabilitation and Transmission Expansion Project is part of the medium-term energy sector investment program approved by the Government of Lesotho for the period 2016-2020. It aims to improve the reliability and quality of electricity supply to customers. The proposed intervention focuses on expanding access, rehabilitation and improvement of the electricity supply system. The improvement in the reliability and availability of the distribution network is to be achieved through rehabilitation of existing electricity supply switching stations, primarily in the municipality of Maseru, rehabilitation of some 33 kV lines, substation upgrade and construction of a 132 kV line to augment supply. The project will also conduct an electricity cost-of-service study and preparation of an energy resources map. Its implementation will allow to renovate and strengthen the electricity distribution network, which will lead to positive impacts on power losses and power cuts, which will reduce their impact by 2% and 25% (resp.), With to the key a network availability up 5%.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data