logo

Lesotho Highlands Water Project (LHWP) Phase II

Sector: Commercial • Location: Lesotho

Source: Programme for Infrastructure Development in Africa (PIDA)

Project
Active

~~The first-phase of the multi-phase Lesotho Highlands Water Project (LHWP) entailed the construction of Katse Dam, Mohale Dams, Matsoku Diversion Tunnel and the Muela hydropower station.  Lesotho benefits from a sustainable, independent energy supply for Lesotho that will meet the country’s electricity requirements and royalty revenue from the project, while South Africa benefits from the securit

Project Information FAQ

Project Information

5 Q
The project “Lesotho Highlands Water Project (LHWP) Phase II” is an infrastructure initiative in the Commercial sector, located in Lesotho. Taiyo aggregates data on it from Programme for Infrastructure Development in Africa (PIDA).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

~~The first-phase of the multi-phase Lesotho Highlands Water Project (LHWP) entailed the construction of Katse Dam, Mohale Dams, Matsoku Diversion Tunnel and the Muela hydropower station.  Lesotho benefits from a sustainable, independent energy supply for Lesotho that will meet the country’s electricity requirements and royalty revenue from the project, while South Africa benefits from the security of supply of high quality water that is transferred into the Vaal River system for  domestic and industrial use in the Gauteng province.<br> Phase II of the LHWP will be implemented in terms of two distinct components: a water delivery system to augment the delivery of water to South Africa and a hydropower generation system, which will increase the current electricity generation capacity in Lesotho.<br> The program involves the construction of the Polihali Dam and the Transfer Tunnel in the Mokhotlong district and a hydropower scheme following the conclusion of a joint feasibility studies.<br> As per the provisions of the Phase II Agreement between the Government of the Kingdom of Lesotho and the Republic of South Africa, the implementation of the Kobong Pump Storage scheme or any other hydro scheme was subject to the outcome of a joint feasibility studies. The technical and the economic feasibility studies for the Kobong Pump Storage scheme were completed in 2013. However, the outcome was that further studies should be undertaken. These  included, a market study, an integration study, geotechnical investigations and legal and commercial arrangements<br> Lesotho secured funding from the World Bank to undertake the above studies, including convectional hydropower options. These studies are expected to be substantially complete by the end of August 2019 . The further feasiility studies have looked at pumped storage and conventional hydropower options. The decision was taken to defer the pump storage option (due to prevailing economic conditions) and advance the conventional options. This entails one site at Oxbow on Malibamatšo River and two sites on the Senqu River.   .<br> The topography of the region allows for the possibility of developing a hydro-power generation in Lesotho in conjunction with the provision of water supplies to the RSA. For South Africa, construction of this dam and related infrastructure will guarantee the desired level of water availability in Gauteng and the Vaal River system in the most cost-effective manner.  In parallel with water conservation measures in the Vaal River, it will also influence the improvement of water quality amongst many benefits.  Phase II water delivery and hydropower generation are expected to be commissioned at the same time early in 2026, and the project close out is forecast for December 2028.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Medium

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data