Lethabo Power Station Solar Photovoltaic Facility
The owner, status and timeline of this project. A free account opens every field.
Source: EWN
The project involves the construction of a 75-megawatt solar photovoltaic (PV) facility on more than 160 hectares of Eskom-owned land at the Lethabo Power Station near Vereeniging. It includes a 4.5-kilometre power line linking the new facility directly to the national grid as part of Eskom's strategy to diversify South Africa's energy mix and reduce reliance on coal.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Solar
- Location
- Vereeniging, Free State, South Africa
- Updated
- 22 Jul 2026
- Source
- EWN
ConstructChat
Ask ConstructChat about Lethabo Power Station Solar Photovoltaic Facility
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the construction of a 75-megawatt solar photovoltaic (PV) facility on more than 160 hectares of Eskom-owned land at the Lethabo Power Station near Vereeniging. It includes a 4.5-kilometre power line linking the new facility directly to the national grid as part of Eskom's strategy to diversify South Africa's energy mix and reduce reliance on coal. |
Original sector | Energy |
Location
Country | South Africa |
State | Free State |
City | Vereeniging |
Source
Source | EWN |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Solar |
Article published date | 2026-05-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
