logo

Level 3 Electric Vehicle Charging Network

Sector: Government • Location: Lihue, Hawaii, United States of America

Source: Dodge

Project
Closed

Planning, design, and construction of three 150 kW Level 3 Electric Vehicle (EV) Charging Stations (chargers) at Bryan J. Baptiste Park, located in Kapa a, L hu e Civic Center, located in L hu e, and Anne Knudsen Park, located in K loa. The project additionally includes the construction of two new parking stalls, and reorientation of a sidewalk segment at Anne Knudsen Park. Planning, design, and c

Status
Closed
Sector
Government, Consumer Products, Power Generation (CCGT), Manufacturing (Industrial), Car parking, Commercial, Electric Vehicles (EVs), Automotive
Location
Lihue, Hawaii, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Level 3 Electric Vehicle Charging Network

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Level 3 Electric Vehicle Charging Network” is an infrastructure initiative in the Government sector, located in Lihue, Hawaii, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Planning, design, and construction of three 150 kW Level 3 Electric Vehicle (EV) Charging Stations (chargers) at Bryan J. Baptiste Park, located in Kapa a, L hu e Civic Center, located in L hu e, and Anne Knudsen Park, located in K loa. The project additionally includes the construction of two new parking stalls, and reorientation of a sidewalk segment at Anne Knudsen Park. Planning, design, and construction of three 150 kW Level 3 Electric Vehicle (EV) Charging Stations (chargers) at Bryan J...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Hawaii

City

Lihue

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Government, Consumer Products, Power Generation (CCGT), Manufacturing (Industrial), Car parking, Commercial, Electric Vehicles (EVs), Automotive

Article published date

2025-04-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project