logo
ProjectBid Results

Level I Regional Confinement Facility

Bid results · Texas · Last reported Aug 2024

Source: Dodge USA

This solicitation is utilizing the Two-Step Sealed Bidding procurement method as described in FAR Part 14.5 toaward a firm fixed-price contract for the project titled ?Construction of a Level-I Confinement Facility? at SheppardAFB, TX. The general scope of the design-bid-build project requires the contractor to construct a Level 1confinement facility with 6-bed configuration with 4 cells + 2 segre

Status
Closed
Sector
Commercial, Power Transmission, Power Generation (CCGT), Manufacturing (Industrial)
Location
Sheppard Afb, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Level I Regional Confinement Facility

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Level I Regional Confinement Facility” is an infrastructure initiative in the Commercial sector, located in Sheppard Afb, Texas, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This solicitation is utilizing the Two-Step Sealed Bidding procurement method as described in FAR Part 14.5 toaward a firm fixed-price contract for the project titled ?Construction of a Level-I Confinement Facility? at SheppardAFB, TX. The general scope of the design-bid-build project requires the contractor to construct a Level 1confinement facility with 6-bed configuration with 4 cells + 2 segregation cells totaling 6 cells. Construction of anadditional 2 cells, for a total of 8 cells overa...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

Sheppard Afb

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Power Transmission, Power Generation (CCGT), Manufacturing (Industrial)

Article published date

2024-08-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project