Lewes Well Header Pipe Replacement
One of 6,027 projects Taiyo tracks in Delaware.
Source: Dodge USA
PROJECT consists of mobilization, removal and disposal, erosion and sediment control measures, furnishing and installing 2,000 lineal feet of 16 inch diameter cement lined ductile iron water main, furnishing and installing 306 lineal feet of 8 inch diameter cement lined ductile iron water main, furnishing and installing 64 lineal feet of 14 inch diameter cement lined ductile iron water main, three
- Status
- Closed
- Sector
- Metal, Water Supply and Storage, Government, Steel, Commercial, Waste Processing and Treatment
- Location
- Lewes, Delaware, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Lewes Well Header Pipe Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | PROJECT consists of mobilization, removal and disposal, erosion and sediment control measures, furnishing and installing 2,000 lineal feet of 16 inch diameter cement lined ductile iron water main, furnishing and installing 306 lineal feet of 8 inch diameter cement lined ductile iron water main, furnishing and installing 64 lineal feet of 14 inch diameter cement lined ductile iron water main, three 3 16 diameter gate valves, three 3 14 diameter gate valves, five 5 8 diameter gate valves, one 1... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Delaware |
City | Lewes |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Water Supply and Storage, Government, Steel, Commercial, Waste Processing and Treatment |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
