Lewis and Gray Bridges Replacement
Sector: Steel • Location: Saskatchewan, Canada
Source: Dodge USA
Removal and Disposal of Two Short-span Bridges and Installation of Three 1 600 Mm on Township Road 230 Over Smith Creek at Ne 31-22-15 West of 3rd Meridian (Lewis Bridge) and Three 2 000 Mm Corrugated Steel Pipe Culverts on Township Road 230 Over Unnamed Creek at Ne 32- 22-17 West of 3rd Meridian (Gray Bridge) for Total Length of 114 M.
- Status
- Closed
- Sector
- Steel, Water Supply and Storage, Bridge, Waste Processing and Treatment, Road, Government, Metal, Commercial
- Location
- Saskatchewan, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Lewis and Gray Bridges Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Removal and Disposal of Two Short-span Bridges and Installation of Three 1 600 Mm on Township Road 230 Over Smith Creek at Ne 31-22-15 West of 3rd Meridian (Lewis Bridge) and Three 2 000 Mm Corrugated Steel Pipe Culverts on Township Road 230 Over Unnamed Creek at Ne 32- 22-17 West of 3rd Meridian (Gray Bridge) for Total Length of 114 M. |
Budget |
Location
Country | Canada |
State | Saskatchewan |
City | Saskatchewan |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Steel, Water Supply and Storage, Bridge, Waste Processing and Treatment, Road, Government, Metal, Commercial |
Article published date | 2024-07-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
