Lewis Farm Dry Stack Expansion
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
expansion of the existing dry stack boat storage (from 224 spaces to 468 total spaces), along with office, retail, boat sales, and boat service (renovations) - existing facility is Sloop Point Marina
- Status
- Prospective
- Sector
- Commercial, Warehouse, Raw Materials, Residential, Manufacturing (Industrial), Seaport
- Location
- Hampstead, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Lewis Farm Dry Stack Expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | expansion of the existing dry stack boat storage (from 224 spaces to 468 total spaces), along with office, retail, boat sales, and boat service (renovations) - existing facility is Sloop Point Marina |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Hampstead |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Warehouse, Raw Materials, Residential, Manufacturing (Industrial), Seaport |
Article published date | 2024-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
