LEWISTON ELEMENTARY SCHOOL - SRTS
One of 10,000+ projects Taiyo tracks in Georgia.
Source: Georgia Department of Transportation (GDOT)
The proposed project consists of pedestrian infrastructure improvements in Evans, GA, in the vicinity of Lewiston Elementary School that will improve accessibility for students walking and biking to school. All improvements will be constructed to meet Americans with Disabilities Act and the Manual on Uniform Traffic Control Devices guidelines, and will be constructed within the existing right-of-w
- Status
- Closed
- Sector
- Car parking, Education, Raw Materials, Road, Government, Automotive
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about LEWISTON ELEMENTARY SCHOOL - SRTS
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project consists of pedestrian infrastructure improvements in Evans, GA, in the vicinity of Lewiston Elementary School that will improve accessibility for students walking and biking to school. All improvements will be constructed to meet Americans with Disabilities Act and the Manual on Uniform Traffic Control Devices guidelines, and will be constructed within the existing right-of-way. New sidewalk will be constructed along River Birch Dr in front of Lewiston Elementary School and on River Birch Dr to the school entrances. On the east side of Hereford Farm Rd, a Class B gravity retaining wall and new sidewalk will be constructed from the intersection with River Birch Dr to the northern boundary of the school property line. Raised intersections will be installed across all three school driveways to increase driver visibility of crossing pedestrians. School zone pavement markings will be installed on Hereford Farm Rd and bicycle racks will be installed at school entrances. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Car parking, Education, Raw Materials, Road, Government, Automotive |
Article published date | 2024-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
