Lewiston Levee Culvert Repair SOURCES SOUGHT
Sector: Water Supply and Storage • Location: Lewiston, Idaho, United States of America
Source: Dodge USA
Area 380 Apron Clean Off on Lewiston Levee. This project involves the moving of rock and debris from the underwater concrete apron located at the outlet of the Area 380 culverts in Lewiston, Idaho, along the Clearwater River. Work shall be completed between the dates of 15 July and 15 September 2024. This task order requires moving rock and debris from the underwater concrete apron located at the
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Waste Processing and Treatment, Commercial
- Location
- Lewiston, Idaho, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Lewiston Levee Culvert Repair SOURCES SOUGHT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Area 380 Apron Clean Off on Lewiston Levee. This project involves the moving of rock and debris from the underwater concrete apron located at the outlet of the Area 380 culverts in Lewiston, Idaho, along the Clearwater River. Work shall be completed between the dates of 15 July and 15 September 2024. This task order requires moving rock and debris from the underwater concrete apron located at the outlet of the Area 380 culverts in Lewiston, Idaho, along the Clearwater River. Approximately 80 ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Idaho |
City | Lewiston |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Waste Processing and Treatment, Commercial |
Article published date | 2024-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
