Lewiston Upper Canal Clean Up and Maintenance
Sector: Water Supply and Storage • Location: Lewiston, Maine, United States of America
Source: Dodge
The work for the UPPER CANAL CLEANUP AND MAINTENANCE project shall consist of, but not be limited to, the complete and satisfactory of cutting and disposal of vines and woody vegetation along the banks of the canals to within three inches of the ground surface. Work can be performed by mechanical bush hog, manual cutting, or similar means. Cut the vines near the ground surface. The cut vegetation
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Consumer Products, Commercial, Manufacturing (Industrial)
- Location
- Lewiston, Maine, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Lewiston Upper Canal Clean Up and Maintenance
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work for the UPPER CANAL CLEANUP AND MAINTENANCE project shall consist of, but not be limited to, the complete and satisfactory of cutting and disposal of vines and woody vegetation along the banks of the canals to within three inches of the ground surface. Work can be performed by mechanical bush hog, manual cutting, or similar means. Cut the vines near the ground surface. The cut vegetation shall be chipped on site or removed from the site to be chipped in another location. Chippings ma... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Maine |
City | Lewiston |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Consumer Products, Commercial, Manufacturing (Industrial) |
Article published date | 2025-08-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
