Lewisville Lake Toll Bridge
One of 10,000+ projects Taiyo tracks in United States.
Source: Road Traffic Technology
Construction of the $122m toll bridge began in 2006 and was completed in June 2009. Light towers flank either side of the signature arch. The LLTB project has been taken up by North Texas Tollway Authority (NTTA), Denton County, Texas Department of Transportation (TxDOT), Little Elm, and Frisco. The LLTB was designed based on the nautical-theme. Construction of the Lewisville Lake Toll Bridge.
- Status
- Closed
- Sector
- Bridge, Cable car, Cement, Hydro, Power Generation (CCGT), Steel, Telecommunications, Water Supply and Storage, Rail, Road, Government, Automotive, Manufacturing (Industrial), Metal, Waste Processing and Treatment
- Location
- United States of America
- Updated
- 22 Jul 2026
- Source
- Road Traffic Technology
ConstructChat
Ask ConstructChat about Lewisville Lake Toll Bridge
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of the $122m toll bridge began in 2006 and was completed in June 2009. Light towers flank either side of the signature arch. The LLTB project has been taken up by North Texas Tollway Authority (NTTA), Denton County, Texas Department of Transportation (TxDOT), Little Elm, and Frisco. The LLTB was designed based on the nautical-theme. Construction of the Lewisville Lake Toll Bridge. Texas and creates an east-west connection across the region. The toll bridge is a part of the Lewisville Lake Corridor. The LLTB is the second section of the $220m Lewisville Lake corridor project, which is currently underway. Construction of the $122m toll bridge began in 2006 and was completed in June 2009. The bridge was opened to traffic on 1 August 2009 following a community-led 5K run and family fun walk entitled ‘Run the Lewisville Lake Toll Bridge’. Project The LLTB project has been taken up by North Texas Tollway Authority (NTTA), Denton County, Texas Department of Transportation (TxDOT), Little Elm, and Frisco. The project mainly focuses on reducing the travel time for commuters between Denton County and Lake Dallas. It provides faster access to points throughout the region. In addition, the LLTB also provides a visually unique landmark. Contractors Jensen Construction Company, a heavy and highway construction firm based in Midwestern, was awarded a $93m contract for construction of the bridge. Jensen is the oldest operating subsidiary of The Rasmussen Group and worked on projects over major rivers throughout the central US. Lewisville Lake corridor: The 13.8 mile Lewisville Lake Corridor connects Interstate Highway 35E at Swisher Road to the Dallas North Tollway at Eldorado Parkway. It has eight sections. Work on the corridor includes installation of roadway striping, signage and toll equipment and work on the deck, railing, drainage and electric systems. Work related to the development of approach roads to the toll bridge will also be taken up. NTTA, Denton County, TxDOT, Little Elm and Frisco will fund the corridor development. Bridge design The LLTB was designed based on the nautical-theme. It mainly includes a lake bridge that crosses the Lewisville Lake, a flowage easement bridge and an electronic toll collection system. The four-lane bridge, which involves two lanes in each direction, has a lighted, weathering steel 360ft arch near the centre of the bridge and a 8ft thick bridge deck structure with 52ft below clearance. Light towers flank either side of the signature arch. Tubular LED lamps are fixed to the arch to enhance the nautical theme. The arch with lighting is basically designed to provide motorists, local residents and boaters with an easily recognisable landmark in southern Denton County. The all-electronic toll collection (all-ETC) system, installed at the bridge is used to collect $1 for TollTag customers and $1.50 for ZipCash drivers. A 4.25 mile drilled shaft, 14.4 miles concrete beams, 34,000 ton concrete substructure, 32,000 ton concrete deck and 1,900 ton steel arch were used in the construction of the bridge. History In 1949, the US Army Corps of Engineers constructed the Lewisville Lake. The Garza Dam on Lake Dallas was, then, breached to combine the waters of both the lakes. This has resulted in the closureof the highway that connects the city of Lake Dallas with Little Elm. In 1991, Denton County began activities on developing lake crossing facilities. It also received voter approval of a bond issue for route studies. In 2001, NTTA was contacted by Denton County for exploring the possibilities of bridge construction. In August 2004, the board of directors of NTTA had approved the design of the toll bridge and during 2006 a contract for constructing the bridge was awarded. LLTB’s official ground breaking was done on 31 January 2007 and half of the construction work was completed by May 2008. The arch structure’s first corner piece was installed on 22 December 2008, while the fix of cables and arch was completed by May 2009. The work on corridor substructures that include foundations and columns, and the construction of flowage easement bridge was completed while deck placement for the lake bridge is yet to be done. NTTA was responsible for the design and construction of the 1.7 mile toll bridge and a 0.3 mile flowage easement bridge. It also operates both the bridges. Financing The NTTA has funded the toll bridge while the cities along the corridor, Denton County and Texas Department of Transportation (TxDOT) funded improvements to the roadways approaching the bridge. |
Original sector | Transportation |
Location
Country | United States of America (USA) |
Source
Source reliability | High |
Source | Road Traffic Technology |
URL |
More Details
Record type | Project |
Sector | Bridge, Cable car, Cement, Hydro, Power Generation (CCGT), Steel, Telecommunications, Water Supply and Storage, Rail, Road, Government, Automotive, Manufacturing (Industrial), Metal, Waste Processing and Treatment |
Article published date | 2023-08-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in United States
- Bayou Bridge Pipeline Project, Louisiana
- Ashland Refinery Expansion, Garyville, Louisiana
- South Lander Street Bridge Project, Seattle, US
- Winston-Salem Northern Beltway, North Carolina
- Interstate 39/90 Reconstruction Project
- I-64/I-264 Interchange Improvements Project, Virginia, US
- Highway 371 Expansion, Minnesota, US
- New Jersey Turnpike
